Home > Parkway News > Secretary Salazar Announces ARRA Project Funding For The Parkway

Secretary Salazar Announces ARRA Project Funding For The Parkway

DOIPressReleaseSecretary Salazar announced today $14,586,000 for Parkway funding under the American Recovery and Reinvestment Act. These funds will help address the more than $200 million in maintenance backlog for the Blue Ridge Parkway; however, none of these funds are earmarked for operations where 71 positions still remain vacant.

A summary of Blue Ridge Parkway are listed below:

  • Reconstruct Historic Stone Guardwalls
  • Rehabilitate Peaks of Otter Dam
  • Remove Hazardous Trees and Encroaching Vegetation Along the Parkway Corridor
  • Remove Vegetation on Bridge Abutments to Increase Driver Safety
  • Repair Trails Parkwide
  • Replace Mt. Pisgah Wastewater Treatment System (Filter bid option)
  • Control Invasive Plants with Student Conservation Corp Team
  • Design and Install a Fire Suppression System in Pisgah Lodge
  • Grade and Resurface Historic Carriage Trails on Moses Cone Estate
  • Rehabilitate White Rock Falls Trail Head and Visitor Center Parking Area
  • Repair Historic Buck Spring Tunnel
  • Repair Historic Stone Walls on Moses Cone Estate
  • Repave Linville Falls Picnic Area, Balsam Gap and LinvilleFalls Maintenance Areas
  • Resurface Deteriorated Maintenance Parking Area – Oteen

TOTAL $14,586,000

A complete inventory of the $750 million appropriated for all parks can be found here …

See and hear Secretary Salazar’s comments here ….

Share This Post
  • RSS
  • del.icio.us
  • StumbleUpon
  • Digg
  • Twitter
  • Mixx
  • Technorati
  • Facebook
  • NewsVine
  • Reddit
  • Google Bookmarks
  • LinkedIn
  • Yahoo! Bookmarks
  • Yahoo! Buzz
  • MySpace
  1. No comments yet.
  1. No trackbacks yet.